|
North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical Re: Presumed RF Interference
At 05:32 PM 3/5/2006, Peter Dambier wrote: [ I am not a PE - IANAPE ]David Lesher wrote:Cut the ground wire in your power cords but ground the equipment directly to a metal frame. I don't think that is good advice. You can't possibly have the as-builts, existing condition, or line drawings in front of you. Safety first. Call the consulting engineers. -M< -- Martin Hannigan (c) 617-388-2663 Renesys Corporation (w) 617-395-8574 Member of Technical Staff Network Operations hannigan@renesys.com
|